Favorite|Message Welcome to JIANGSU XINHERMAN TECHNOLOGY CO., LTD. website!

JIANGSU XINHERMAN TECHNOLOGY CO., LTD.《Efficient And Energy Conservation Cooling Tower Factory》

Tel+86 13961837633
+86 0510-81152329

专业服务
Location:XINHERMAN > News >

What should be paid attention to when connecting pipes outsi

Article source:未知editor-in-charge:adminpopularity:time:2025-06-10 13:00
Precautions for external connection of cross flow cooling tower:
 
1. The pipes on both sides of the cooling tower should be kept as long as possible to ensure balanced resistance;
 
2. Each inlet and outlet pipe of the cooling tower should be equipped with a valve to regulate the water flow;
 
3. Pipeline design should be as simple and direct as possible;
 
4. Welding operations on the tower are prohibited. Welding should be carried out far away from the tower body, and then connected to the reserved inlet and outlet flanges of the cooling tower after completion.
Keywords: 横,流式,冷却塔,外,接管,应注意,什么,横,流式,
Online Service

Sales service and technical exchange